Blue Lake Wake Park
First-generation system · 208 m · 2013
Reversible cable systems for wakeboarding and water skiing — from idea to launch.
A reversible cable system for daily commercial use, competitions and training. Daily ride report on the display.

Tap a photo to open the gallery.
First-generation system · 208 m · 2013
Model PRO · depth 5 m, length 130 m · 2026
2 × Model PRO · 24 m towers · 2024
Model PRO · 170 m · 2023
2 × Model PRO · 200 and 190 m · 2015, 2023
Model PRO · 170 m · 2020
2 × Model PRO · 175 and 185 m, competitions · 2019
2 × Model PRO · 163 and 150 m, competitions · 2021
Model PRO · 159 m, competitions · 2022
3 × Model PRO · 190, 170 and 153 m, competitions · 2014
Tap a dot to see what we did in that city.
our cable systemsupgrades, other manufacturers’ equipment
Some parks run 2–3 systems.
We welcome references: you can contact park owners and ask what it is like to work with us.
A non-standard project with higher strength requirements. Installation on the lake bed at 5 m depth using a reinforced 16 m tower.
Another large project in feature manufacturing. We built a 20 m Rail 2 Rail weighing about two tonnes. A big, technically complex structure made for a modern wake park.
A record year! There were so many projects that we ourselves wondered how we managed them all.
A PRO cable system installed in just two days.
Two PRO cable systems at once for a new wake park.
Fabrication and installation of a massive all-welded plastic Transition Rail weighing about two tonnes.
Installation and launch of a third-party cable system.
A return to where it all began! We installed a new PRO to replace our first cable system, built in 2013.
Installation of two third-party cable systems. Another proof that we can work with equipment from different manufacturers and find solutions in difficult situations.
Besides the large projects, over the year we also built and installed many smaller features for various wake parks.
A real leap in complex engineering projects. We installed three cable systems on the bed of a lake 14 m deep: two of our own make and one from another manufacturer, which we improved and made ready for use. Seven Bay is where a new chapter began for us: building features for wake parks. We made a full set for the circular cable: two 18 m fun boxes, a two-level ollie kicker, a slider and other features.
We upgraded a cable system from another manufacturer by installing our software and control panel. We help launch and improve equipment regardless of where it comes from.
We installed a modern PRO cable system and a tow lift for tubing that works all year round. We are widening our range and learning new kinds of cable systems.
After working with equipment from several manufacturers the customer came back to us. We completed a second order and installed a PRO cable system.
Eight years later the park owners chose us again! This time the project was especially large: installation at a depth of three metres with 18 m towers set directly on the bed. New engineering challenges that we handled successfully.
After working with different manufacturers the customer chose our company for a second cable system. For us it is one more confirmation of the quality of our equipment and the trust in our work.
The customer mailed us their control cabinet. We installed our own controller, control panel and software. The cabinet then went back, the customer did the installation themselves, and the system worked flawlessly.
Installation in winter at −10 °C. The first run took place right on the ice. An unusual experience that proved once more that for us the installation season does not end with summer.
Two full projects with a non-standard way of placing the equipment: directly on the bed of the estuary.
A special story for us. Back in 2010 we dreamed of building our own wake park and looked for ways to do it. It took ten years to gather the experience and make it happen. That is how our second own location appeared.
A customer’s trust is the best rating of our work. After a successful first job the park owners came back to us to repair and upgrade another third-party cable system.
Five years after our first cooperation the park owners came back to us. The third PRO cable system confirmed their trust in our work.
We do not only produce our own equipment, we also help improve systems from other manufacturers. At this site we carried out repairs and installed our electrical system and power drive.
Two upgraded PRO cable systems. The equipment has stood the test of time: the systems have run for several years without breakdowns and still delight athletes.
Another point on the map of our projects. An unusual location and new experience installing equipment on the coast.
Our first experience with the Light model. The project turned out to be difficult and needed extra warranty work. We brought the system to working order and the customer was happy with the result.
Two cable systems for different rider levels. A complex installation that we completed quickly. We also remember the pleasant cooperation with the customer, Yevhen.
A cable system for real giants! The customer built a huge structure, 13 m high and 300 m long, on their own. Our task was to design and install the electrical part and the drive. We spared the team long experiments, and our electronics still work reliably today.
An installation with local ground to deal with: the tower piles had to be screwed into a dense layer of shell rock. We managed it and launched the site.
A new city for us, and an introduction to wakeboarding for its residents. One more finished project in our portfolio.
Our project in the south of Ukraine. The new cable system gave local riders more room to ride.
This site is remembered for unusual installation conditions. It is where we first installed a cable system in winter, working right on the ice.
Two new projects in Kharkiv. We widened the geography of our installations, refined the design and gained the experience that became the basis of later developments.
This is where our story in wakeboarding began: the first project, the first experience and the start of a long road that continues today.
Our systems run 3 to 6 years without specialist intervention — that is why we can warrant them.
The final cost for a full launch, with no hidden payments.
Technical passport, legal opinions, technical specifications, sanitary and fire-safety papers.
Hot-dip galvanizing protects against corrosion for 50 years. No painting needed.
From contract to first ride — about 2 months. Order in winter and everything is ready for the season. Start with step 1

370 kg · 4 × 2 × 1 m

650 kg · 8 × 2 × 1.3 m

500 kg · 14 × 0.5 × 0.5 m
Built in our own workshop in Dnipro. Custom ones from your sketch: rail-to-rail, funboxes, rooftops; we have made pieces up to 3 tonnes.
Discuss your obstacleEnter your own assumptions. This is not an income promise: results depend on location, demand, weather and operations.
Example for an average wake park — change it to match yours
Custom projects we built and launched to order.
120 m · year-round · Volia Yakubova, Lviv region
Made from plastic in our own workshop
Our own production in Dnipro
Frame and cover from our workshop
Need something custom? Let’s discuss
Manufacturing of the system (2 galvanized towers, electric drive, cables, moving and fixed carriages, control cabinet, remote, control software, 7 screw anchors) and supervised installation: our specialist plus 2–4 helpers from your side. Not included: delivery from our warehouse to the site, a motorboat during installation, permits, travel and accommodation for our two specialists.
Water width from 20 m, depth from 1.2 m, riding length 100–200 m (120–170 m is the sweet spot), riding zone up to 15 m wide, 10–15 m on each shore for guy wires. Calm water is ideal; we assess every lake individually. We have built on open water, on an estuary, and with towers set on the lake bed at depths of up to 14 m.
One system needs 380 V, 3-phase, 7.5 kW (16 A). If you use a generator, it should be at least 11 kW.
Manufacturing takes about 1.5 months. Installation takes 4 days in normal conditions and up to 2 weeks in complex ones (for example, towers on the lake bed). It is best to order in winter and be ready for the season without rush.
We work under a contract, any form of payment. 70% advance (can be split into three payments during production), 20% when the equipment is ready to ship, 10% after installation, launch and handover. The price is US$17,000 at the current rate. Towers on the lake bed: terms and price agreed separately. Sole proprietor, no VAT.
3-year warranty with proper use; spare parts are made by us in Dnipro. We either come to you or help remotely, as you prefer. A site visit covers travel, accommodation and the work itself, usually replacing rollers and greasing bearings.
Yes. We train operators on your site or at our location. We also have videos for new operators: how to ride people, how to start the day and how to look after the system.
Yes, we have export experience. The price is converted at the current rate.
Didn't find your answer? Message us on Telegram